• 1188 Fengliang Road, Fengxian District,Shanghai
  • +8621-68911957

Shanxi Xi'an 150 tons of construction waste resources reuse project

Project Introduction

At present, whether it is "garbage siege" or "turning waste into treasure" is a hot topic. As the domestic epidemic situation is controllable and the provinces have unblocked and resumed work, the national infrastructure will truly usher in an explosive growth phase. Boss Sun used to work on house demolition and was very optimistic about the construction waste resource reuse project. He found an engineering designer in Shanghai Dongmeng, and requested to configure a crawler mobile crushing station with a small footprint and high working efficiency. Our company's staff has designed this production line, which has strong moving ability and strong combination ability. It can process the materials in place and complete the system work in a short time.
 
Production capacity

150t/h
 
Processed materials
 
construction rubbish
 
Advantages
 
1.Fast transition and wider application
2.Green environmental protection, energy saving and low consumption
3.Modern processing base, digital processing
4.Structural upgrade, high quality requirements
5.Optimized design, integrated control system
6.One-stop pre-sales and after-sales services to ensure maximum customer benefits
 
Scene Atlas
 
 
 
 
Device Configuration

Mobile impact crushing station
Solutions

Our Solutions

Weathered stone Crusher

SOLUTIONS

Weathered stone …

Weathered stone crusher/weathered stone crushed stone production line/weathered stone crushed stone complete equipment.......

Diabase Crusher

SOLUTIONS

Diabase Crusher

Diabase cone machine/diabase stone crushing complete equipment/diabase crushing production line.......

River pebbles Crusher

SOLUTIONS

River pebbles Cr…

River pebble sand making machine / river pebble sand production line / river pebble sand making equipment.......

Brands
Brands
Brands
Brands
Brands
Brands
Brands
Brands